These Guidelines were just released by Safe Streets Burlington and the Pine Street Coalition, a basic approach to changes sought to the current Champlain Parkway design...
CHAMPLAIN PARKWAY AND PINE STREET CORRIDOR
RE-DESIGN GUIDELINES
“Shape a safe and complete streets project for a livable community as well as enabling a thriving business and arts center”
Cities evolve and so must their transportation systems. The South End highway project—once part of a long abandoned freeway encircling Burlington and subsequently up-dated--still fails to serve the City’s residents. First called the “Southern Connector” and more recently the “Champlain Parkway,” the project requires a reconceptualization to incorporate safety, street connectivity, a reduction in intersection delay, and to support pleasant walk and bike-ability. With these improvements, the corridor can enhance our burgeoning South End Arts District and associated businesses.
Over the last year, City residents in the Save Streets Burlington Coalition (SSB) have met among themselves and with City officials, eventually formulating the following “Champlain Parkway and Pine Street Corridor Redesign Guidelines” (Guidelines).
While specific details will require the work of experts, these principles reflect our collective vision of streets supporting livable communities.
When the initial thoroughfare was planned in the 1960s, it incorporated a “speed-the-car” logic. The current Parkway design remains committed to that outdated concept. Worse, the $43 million current Parkway design moves away from both safe street and complete street principles. These better principles are reflected in recent public discussions, Plan BTV Downtown and Plan BTV South End, the North Avenue Corridor Plan, the recent preliminary Railyard studies. the 2014 recommendations of the city's Walk Bike Council, and the City Walk Bike Master Plan now nearing conclusion. The current Parkway plan contravenes each of these studies.
In January 2016, SSB issued a White Paper which identified South End road needs as beginning with separate walk and bike facilities, environmental sensitivity along this sensitive lake-front area, and overall livability. It prioritized safety—minimizing highway injuries and fatalities—and called for roundabouts rather than signaled intersections. These briefer “Champlain Parkway and Pine Street Corridor Redesign Guidelines” do not attempt a detailed prescription but set a starting point and identify essential planning principles to guide any final design. Robust public discussion must be a component as the design phase continues to address integration of mass transit along the Pine Street corridor, traffic facilitation on the Pine/King and Pine/Maple intersections, and preservation of existing businesses and rail activity.
Design Guideline: Bottom of Pine Street to Flynn Avenue
The present Parkway design reduces the roadway to one lane in each direction with a median on the section west of Shelburne Road. While this works, there’s a flaw. What’s needed at Pine Street is an intersection that avoids barricading off this important north/south corridor from points south so access to Queen City Park Road and the Kmart lot and other area businesses is